PEC & PPIB Certified · In-House Engineers

Pakistan's Most Reliable Solar & Electrical Engineering Platform.

Zero unverified freelancers. Guaranteed upfront pricing, uniformed engineers, and Tier-1 solar setups across Lahore, Islamabad, Karachi, Rawalpindi, and Faisalabad.

2,400+ installs completed with a 4.9/5 rating

Instant Solar Estimate
See your recommended system size in seconds.
PKR
Recommended System11 kW System
Get Full Precision Estimate
100%In-House Staff
30-DayWork Warranty
4.9/5Customer Rating
0%Price Haggling

Two Fleets. One Standard of Engineering.

Whether you're going solar or fixing a fault, the same uniformed, in-house team shows up — never a subcontractor.

Solar Engineering

Tier-1 panels, CAD-designed layouts, and full net-metering processing for grid-tied, hybrid, and commercial installations.

  • Grid-Tied Systems
  • Hybrid Battery Setups
  • Commercial 3-Phase Solar
Explore Solar Solutions

In-House Repair Fleet

Uniformed electricians dispatched with calibrated tools for fast, standardized fault repair — no unverified freelancers.

  • DB Box Rewiring
  • Short Circuit Diagnostics
  • EV Charger Installation
View Repair Services

Unorganized Local Electricians vs. electric.com.pk Team Standard

CategoryUnorganized Local Electricianselectric.com.pk Team Standard
Pricing
Verbal quotes, haggling on-site
Fixed, written quote before work starts
Technicians
Unverified freelancers, no ID
Background-checked, uniformed, badged staff
Warranty
No warranty on labor
30-Day labor guarantee on every job
Tools
Improvised, uncalibrated tools
Calibrated digital diagnostic equipment
Wiring Standard
Inconsistent, non-color-coded
Standardized, color-coded, code-compliant

Recently Completed Projects

Verified before-and-after results from customers across Pakistan.

DB Box Rewire — DHA Phase 5, Lahore - Before electrical engineering work Before
DB Box Rewire — DHA Phase 5, Lahore - After verified electrical installation After

DB Box Rewire — DHA Phase 5, Lahore

"The old board was a fire hazard. Their team color-coded and re-labeled the whole box in one afternoon."

— Ahmed R., Verified Customer Share
10 kW Hybrid Solar — Bahria Town, Islamabad - Before electrical engineering work Before
10 kW Hybrid Solar — Bahria Town, Islamabad - After verified electrical installation After

10 kW Hybrid Solar — Bahria Town, Islamabad

"Bill dropped from PKR 95k to under 20k. Net-metering was approved in 5 weeks flat."

— Sana K., Verified Customer Share
Common Questions
Verified Q1 2026 · NEPRA Prosumer Regulations Compliant

Frequently Asked Questions

Clear, code-compliant answers regarding our engineering standards, DISCO Net Billing, warranties, and upfront pricing.

• On-Grid (Grid-Tied): Connects directly to the DISCO utility grid with a bi-directional Green Meter under Net Billing. It exports surplus daytime electricity and delivers the fastest financial payback (3.2–4.5 years), but shuts down during grid outages (anti-islanding safety) unless paired with an active grid reference. • Hybrid: Combines grid-tied export capabilities with a dedicated LiFePO4 lithium battery bank. It offsets expensive daytime utility units and keeps essential loads (air conditioners, lights, refrigerator, WiFi) running smoothly during grid load shedding. • Off-Grid: Operates completely disconnected from the grid, relying 100% on solar panels and deep-cycle battery banks. Ideal for remote farmhouses, agricultural tubewells, or off-grid mountain cabins.